Doug's Sounding Board


01
Feb

Finally some kitchen updates!

You can see some results from my painting in the kitchen. That cleared the way for the contractor to install the cabinets. Unfortunately, two of the upper cabinets were damaged and they will build us new ones. Also the trash drawer was built wrong so they need to fix that too, but that doesn’t interfere with the cabinet boxes. They made it so you have to open two doors to pull out the bins when the entire thing should be a pull-out or two side by side pull-outs.

Templating for the counter tops will happen on Friday.

Some tile work has happened in the bathroom too. You can see the different floor tiles in place and some of the wall tile. Also you can see a picture of the not yet installed tub. Hopefully the tub will get installed today which will allow the application of more tile.

Leave a Reply

Doug's Sounding Board is is proudly powered by Wordpress
Navigation Theme by GPS Gazette